Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
625
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0311 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $889 | $1,320 | Implemented |
MI0302 # 01 Y:2016 | 01 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,170 | $29,740 | Implemented |
MI0302 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,840 | $940 | Implemented |
MI0302 # 03 Y:2016 | 03 | 2016 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,045 | $11,648 | Not Implemented |
MI0302 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,652 | $4,744 | Implemented |
MI0302 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,711 | $2,387 | Implemented |
MI0302 # 06 Y:2016 | 06 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,171 | $260 | Not Implemented |
MI0302 # 07 Y:2016 | 07 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,023 | $3,200 | Not Implemented |
MI0302 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,335 | $416 | Implemented |
MI0302 # 09 Y:2016 | 09 | 2016 | AIR CONDITION ONLY SPACE NECESSARY | $1,008 | $160 | Implemented |
MI0302 # 10 Y:2016 | 10 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $521 | $116 | Not Implemented |
MI0300 # 01 Y:2016 | 01 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $98,547 | $35,359 | Not Implemented |
MI0300 # 02 Y:2016 | 02 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $96,255 | $386 | Implemented |
MI0300 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $75,921 | $15,156 | Not Implemented |
MI0300 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $68,863 | $173 | Implemented |
MI0300 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $47,043 | $12,140 | Implemented |
MI0300 # 06 Y:2016 | 06 | 2016 | PAY UTILITY BILLS ON TIME | $37,529 | $0 | Implemented |
MI0300 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,599 | $40 | Implemented |
MI0300 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,521 | $1,660 | Implemented |
MI0300 # 09 Y:2016 | 09 | 2016 | UPGRADE OBSOLETE EQUIPMENT | $15,163 | $4,691 | Not Implemented |
MI0300 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,807 | $22,446 | Implemented |
MI0300 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $7,917 | $1,281 | Implemented |
MI0300 # 12 Y:2016 | 12 | 2016 | USE OPTIMUM THICKNESS INSULATION | $6,276 | $1,644 | Not Implemented |
MI0300 # 13 Y:2016 | 13 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,924 | $40 | Implemented |
MI0300 # 14 Y:2016 | 14 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,797 | $2,520 | Implemented |