IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0358 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,159 $700 Not Implemented
LL0358 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $729 $919 Not Implemented
LL0358 # 08 Y:2011 08 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $333 $160 Not Implemented
LL0358 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $304 $700 Not Implemented
IA0474 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,989 $668 Not Implemented
IA0474 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,851 $5,045 Not Implemented
IA0474 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,183 $11,760 Not Implemented
OK0817 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,438 $510 Implemented
OK0817 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,812 $1,220 Not Implemented
OK0817 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,745 Not Implemented
OK0817 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $2,751 Not Implemented
OK0817 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,469 $55,540 Not Implemented
OK0817 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,965 $47,375 Not Implemented
OK0817 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,011 $23,400 Implemented
OK0817 # 08 Y:2011 08 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,546 $12,837 Not Implemented
OK0817 # 09 Y:2011 09 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,450 $4,260 Not Implemented
OK0817 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,371 $0 Implemented
SF0404 # 01 Y:2011 01 2011 OPERATE BOILERS ON HIGH FIRE SETTING $2,708 $0 Not Implemented
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0404 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $257 $22 Implemented
SF0404 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $17,934 $5,426 Implemented
SF0404 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,812 $2,778 Not Implemented
SF0404 # 06 Y:2011 06 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,688 $12,500 Not Implemented
SF0404 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $5,213 Not Implemented
SF0404 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $697 $1,356 Implemented