IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0435 # 12 Y:2023 12 2023 INSTALL OCCUPANCY SENSORS $297 $96 n/a
IP0180 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,258 $0 Implemented
IP0180 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $32 Implemented
IP0180 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,666 $1,830 Implemented
IP0180 # 04 Y:2023 04 2023 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $4,518 $5,490 Not Implemented
IP0180 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,597 $3,719 Not Implemented
IP0180 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,621 $36,055 Implemented
IP0180 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,444 $26,075 Not Implemented
UA0281 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $18,036 $12,615 n/a
UA0281 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,808 $5,698 n/a
UA0281 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,375 $1,000 n/a
UA0281 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,484 $8,591 n/a
UA0281 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,035 $68,083 n/a
UA0281 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $6,060 $1,885 n/a
UA0281 # 07 Y:2023 07 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,437 $26,750 n/a
UA0281 # 08 Y:2023 08 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,490 $49,464 n/a
UA0281 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,483 $47,040 n/a
UA0281 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,002 $15,154 n/a
NL0090 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,602 $19,848 Implemented
NL0090 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,629 $7,670 Implemented
NL0090 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,382 $4,500 Implemented
NL0090 # 04 Y:2023 04 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,454 $1,764 Not Implemented
NL0090 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $822 $1,190 Not Implemented
NL0090 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $565 $831 Not Implemented
MI0434 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,836 $550 Implemented