Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0435 # 12 Y:2023 | 12 | 2023 | INSTALL OCCUPANCY SENSORS | $297 | $96 | n/a |
IP0180 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,258 | $0 | Implemented |
IP0180 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,158 | $32 | Implemented |
IP0180 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,666 | $1,830 | Implemented |
IP0180 # 04 Y:2023 | 04 | 2023 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $4,518 | $5,490 | Not Implemented |
IP0180 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,597 | $3,719 | Not Implemented |
IP0180 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,621 | $36,055 | Implemented |
IP0180 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,444 | $26,075 | Not Implemented |
UA0281 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $18,036 | $12,615 | n/a |
UA0281 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,808 | $5,698 | n/a |
UA0281 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,375 | $1,000 | n/a |
UA0281 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,484 | $8,591 | n/a |
UA0281 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,035 | $68,083 | n/a |
UA0281 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $6,060 | $1,885 | n/a |
UA0281 # 07 Y:2023 | 07 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,437 | $26,750 | n/a |
UA0281 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,490 | $49,464 | n/a |
UA0281 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,483 | $47,040 | n/a |
UA0281 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,002 | $15,154 | n/a |
NL0090 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,602 | $19,848 | Implemented |
NL0090 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,629 | $7,670 | Implemented |
NL0090 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,382 | $4,500 | Implemented |
NL0090 # 04 Y:2023 | 04 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,454 | $1,764 | Not Implemented |
NL0090 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $822 | $1,190 | Not Implemented |
NL0090 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $831 | Not Implemented |
MI0434 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $29,836 | $550 | Implemented |