Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0297 # 02 Y:1986 | 02 | 1986 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $42,615 | $46,000 | Implemented |
TN0297 # 03 Y:1986 | 03 | 1986 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $23,107 | $20,800 | Implemented |
TN0297 # 04 Y:1986 | 04 | 1986 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $6,032 | $1,810 | Not Implemented |
TN0297 # 05 Y:1986 | 05 | 1986 | INSULATE BARE EQUIPMENT | $3,691 | $492 | Implemented |
TN0283 # 01 Y:1986 | 01 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $31,143 | $20,000 | Implemented |
TN0283 # 02 Y:1986 | 02 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $15,904 | $0 | Not Implemented |
TN0283 # 04 Y:1986 | 04 | 1986 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,182 | $940 | Implemented |
TN0283 # 05 Y:1986 | 05 | 1986 | INSULATE BARE EQUIPMENT | $3,742 | $660 | Implemented |
TN0283 # 06 Y:1986 | 06 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,130 | $2,600 | Implemented |
TN0283 # 07 Y:1986 | 07 | 1986 | INSULATE BARE EQUIPMENT | $849 | $276 | Not Implemented |
TN0286 # 01 Y:1986 | 01 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,868 | $2,430 | Not Implemented |
TN0286 # 02 Y:1986 | 02 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $2,353 | $1,315 | Not Implemented |
TN0286 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,478 | $0 | Implemented |
TN0286 # 04 Y:1986 | 04 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,097 | $3,500 | Implemented |
TN0286 # 05 Y:1986 | 05 | 1986 | HEAT WATER WITH EXHAUST HEAT | $875 | $3,900 | Not Implemented |
TN0286 # 06 Y:1986 | 06 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,285 | $615 | Implemented |
TN0286 # 07 Y:1986 | 07 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $744 | $300 | Implemented |
TN0289 # 01 Y:1986 | 01 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,485 | $105,000 | Not Implemented |
TN0289 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,373 | $4,500 | Implemented |
TN0289 # 03 Y:1986 | 03 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $11,562 | $150 | Implemented |
TN0289 # 04 Y:1986 | 04 | 1986 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $143,750 | $40,000 | Implemented |
TN0290 # 01 Y:1986 | 01 | 1986 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $8,544 | $9,080 | Implemented |
TN0290 # 02 Y:1986 | 02 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,673 | $3,100 | Implemented |
TN0290 # 03 Y:1986 | 03 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $948 | $1,885 | Not Implemented |
TN0290 # 04 Y:1986 | 04 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,162 | $0 | Not Implemented |