IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162,408

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0548 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,334 $20,063 Implemented
SU0548 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $10,902 $52,000 Implemented
SU0548 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $14,839 $12,200 Implemented
SU0548 # 10 Y:2024 10 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $14,025 $12,000 Implemented
TR0053 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,176 $6,207 Implemented
TR0053 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,921 $47,775 Not Implemented
TR0053 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $1,000 Implemented
TR0053 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,908 $78,403 Not Implemented
TR0053 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,027 $2,500 Implemented
UD1080 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $808 $941 Implemented
UD1080 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $165 $0 Not Implemented
UD1080 # 03 Y:2024 03 2024 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $1,555 $405 Not Implemented
UD1080 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31 $142 Not Implemented
UD1080 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,018 $924 Implemented
UD1080 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,541 $11,151 Implemented
UF0610 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,899 $322,608 Implemented
UF0610 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $28,883 $18,333 Implemented
UF0610 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,012 $25,400 Implemented
UF0610 # 04 Y:2024 04 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,119 $36,000 Not Implemented
UF0610 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $4,345 $2,330 Implemented
UF0610 # 06 Y:2024 06 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,691 $5,108 Implemented
UF0610 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,062 $7,200 Not Implemented
UF0610 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $1,315 $4,000 Implemented
UF0610 # 09 Y:2024 09 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $54,895 $0 Implemented
UF0610 # 10 Y:2024 10 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $15,675 $25,000 Not Implemented