Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0060 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,215 | $19,196 | Not Implemented |
NC0060 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $354 | $2,430 | Not Implemented |
NC0060 # 04 Y:1995 | 04 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,567 | $15,000 | Not Implemented |
NC0060 # 05 Y:1995 | 05 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,838 | $15,000 | Not Implemented |
NC0060 # 06 Y:1995 | 06 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,634 | $4,545 | Implemented |
NC0060 # 07 Y:1995 | 07 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $1,556 | Implemented |
NC0060 # 08 Y:1995 | 08 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,418 | $1,500 | Implemented |
NC0059 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,340 | $0 | Implemented |
NC0059 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $802 | $450 | Implemented |
NC0059 # 03 Y:1995 | 03 | 1995 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $95,329 | $560,000 | Not Implemented |
NC0059 # 04 Y:1995 | 04 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,062 | $1,540 | Implemented |
NC0059 # 05 Y:1995 | 05 | 1995 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,149 | $7,500 | Not Implemented |
NC0059 # 06 Y:1995 | 06 | 1995 | RECOVER AND REUSE COOLING WATER | $27,000 | $6,000 | Not Implemented |
NC0059 # 07 Y:1995 | 07 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $40,000 | $0 | Implemented |
NC0058 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $149 | $292 | Implemented |
NC0058 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,902 | $30,410 | Implemented |
NC0058 # 03 Y:1995 | 03 | 1995 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,940 | $10,000 | Not Implemented |
NC0058 # 04 Y:1995 | 04 | 1995 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $19,158 | $80,000 | Not Implemented |
NC0058 # 05 Y:1995 | 05 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,618 | $2,500 | Implemented |
NC0058 # 06 Y:1995 | 06 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $20,246 | $4,000 | Not Implemented |
NC0058 # 07 Y:1995 | 07 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,975 | $240 | Implemented |
NC0058 # 08 Y:1995 | 08 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,702 | $0 | Implemented |
NC0058 # 09 Y:1995 | 09 | 1995 | INSULATE BARE EQUIPMENT | $4,862 | $1,500 | Not Implemented |
NC0057 # 01 Y:1995 | 01 | 1995 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $7,069 | $0 | Implemented |
NC0057 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $142 | $180 | Implemented |