IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0195 # 04 Y:1999 04 1999 IMPROVE SPACE COMFORT CONDITIONING $960 $3,000 Not Implemented
HO0195 # 05 Y:1999 05 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $2,496 $5,000 Implemented
HO0195 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $6,240 $340 Not Implemented
HO0195 # 07 Y:1999 07 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,192 $5,000 Not Implemented
HO0195 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,248 $2,500 Not Implemented
HO0194 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,344 $27,758 Not Implemented
HO0194 # 02 Y:1999 02 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $602 $315 Not Implemented
HO0194 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,381 $1,295 Not Implemented
HO0194 # 04 Y:1999 04 1999 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $4,698 $18,360 Not Implemented
HO0194 # 05 Y:1999 05 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $460 $300 Not Implemented
HO0194 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $2,000 $200 Not Implemented
HO0194 # 07 Y:1999 07 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,880 $3,500 Not Implemented
HO0191 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,167 $5,870 Implemented
HO0191 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,826 $120 Implemented
HO0191 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $364 $410 Not Implemented
HO0191 # 04 Y:1999 04 1999 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $875 $400 Implemented
HO0191 # 05 Y:1999 05 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,245 $1,500 Not Implemented
HO0191 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $4,160 $1,320 Not Implemented
HO0191 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,125 $500 Implemented
HO0191 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $450 $1,000 Implemented
HO0191 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,125 $1,000 Not Implemented
HO0175 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,263 $16,755 Implemented
HO0175 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,201 $168 Implemented
HO0175 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $500 Not Implemented
HO0175 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $800 $300 Implemented