IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0195 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,142 $1,715 Not Implemented
WM0195 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,725 $13,127 Implemented
MA0854 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,825 $12,405 Implemented
MA0854 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $4,889 $35,240 Not Implemented
MA0854 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,725 $7,950 Not Implemented
MA0854 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $3,953 $6,018 Implemented
MA0854 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,126 $1,425 Not Implemented
MA0854 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $3,125 Implemented
MI0418 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,311 $1,060 Implemented
MI0418 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $1,796 $1,143 Not Implemented
MI0418 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,322 $100 Not Implemented
MI0418 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,109 $910 Implemented
MI0418 # 05 Y:2023 05 2023 PAY UTILITY BILLS ON TIME $325 $0 Implemented
OR0768 # 01 Y:2023 01 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,535 $8,125 Implemented
OR0768 # 02 Y:2023 02 2023 USE AUTOMATIC FLOW CONTROL $24,867 $9,600 Not Implemented
OR0768 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,178 $5,693 Implemented
UU0216 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $40,810 $55,030 Not Implemented
UU0216 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $33,351 $454,189 Not Implemented
UU0216 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $28,144 $4,000 Not Implemented
UU0216 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,370 $31,280 Not Implemented
UU0216 # 05 Y:2023 05 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,644 $500 Not Implemented
UU0216 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,031 $2,025 Not Implemented
WM0194 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $202,110 $250,000 Not Implemented
WM0194 # 02 Y:2023 02 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $161,122 $300,000 Not Implemented
WM0194 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,924 $39,795 Implemented