Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0169 # 14 Y:2023 | 14 | 2023 | DISCONNECT BALLASTS | $7 | $20 | Implemented |
IP0169 # 15 Y:2023 | 15 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $10,836 | $47,613 | Not Implemented |
DL0220 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $84,324 | $0 | Implemented |
DL0220 # 02 Y:2023 | 02 | 2023 | USE OPTIMUM TEMPERATURE | $6,980 | $0 | Implemented |
DL0220 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,020 | $0 | Not Implemented |
DL0220 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,928 | $0 | Not Implemented |
DL0220 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,704 | $0 | Not Implemented |
DL0220 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,418 | $0 | Not Implemented |
DL0220 # 07 Y:2023 | 07 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,578 | $0 | Not Implemented |
DL0220 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,694 | $0 | Not Implemented |
DL0220 # 09 Y:2023 | 09 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,332 | $20,000 | Not Implemented |
DL0220 # 10 Y:2023 | 10 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,153 | $9,740 | Not Implemented |
DL0220 # 11 Y:2023 | 11 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,387 | $6,500 | Not Implemented |
DL0220 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,150 | $8,994 | Implemented |
CC0013 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,074 | $0 | n/a |
CC0013 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,363 | $0 | n/a |
CC0013 # 03 Y:2023 | 03 | 2023 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $4,697 | $8,400 | n/a |
CC0013 # 04 Y:2023 | 04 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $21,990 | $40,000 | n/a |
CC0013 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,597 | $180,600 | n/a |
AM0874 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,860 | $3,000 | Implemented |
AM0874 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,060 | $430 | Implemented |
AM0874 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,850 | $4,340 | Implemented |
AM0874 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $49,585 | $3,600 | Implemented |
AM0874 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,970 | $18 | Implemented |
AM0874 # 06 Y:2023 | 06 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,900 | $35 | Not Implemented |