Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0175 # 05 Y:1998 | 05 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $9,375 | $0 | Implemented |
HO0175 # 06 Y:1998 | 06 | 1998 | CLEAR AND RENT EXISTING SPACE | $18,000 | $3,000 | Implemented |
HO0187 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,545 | $90,112 | Not Implemented |
HO0187 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $133 | $415 | Not Implemented |
HO0187 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $267 | $500 | Implemented |
HO0187 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $1,092 | $650 | Not Implemented |
HO0187 # 05 Y:1998 | 05 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $807 | $250 | Implemented |
HO0187 # 06 Y:1998 | 06 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,125 | $100 | Implemented |
MA0426 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $9,368 | $24,200 | Not Implemented |
MA0426 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $586 | $458 | Implemented |
MA0426 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $623 | $25 | Implemented |
MA0426 # 04 Y:1998 | 04 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $902 | $1,975 | Not Implemented |
MA0426 # 05 Y:1998 | 05 | 1998 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $2,320 | $9,100 | Not Implemented |
MA0425 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,172 | $146,000 | Not Implemented |
MA0425 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,915 | $160,000 | Not Implemented |
MA0425 # 03 Y:1998 | 03 | 1998 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $264,206 | $700,000 | Not Implemented |
MA0425 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,206 | $104,150 | Not Implemented |
MA0425 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,320 | $1,650 | Not Implemented |
MA0425 # 06 Y:1998 | 06 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,093 | $14,700 | Not Implemented |
MA0414 # 01 Y:1998 | 01 | 1998 | MOVE BOILER TO MORE EFFICIENT LOCATION | $64,705 | $204,550 | Not Implemented |
MA0414 # 02 Y:1998 | 02 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,670 | $12,451 | Implemented |
MA0414 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,293 | $12,457 | Not Implemented |
MA0414 # 04 Y:1998 | 04 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,405 | $453 | Implemented |
MA0414 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,508 | $23,028 | Implemented |
MA0414 # 06 Y:1998 | 06 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $21,122 | $50,000 | Not Implemented |