Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,065
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0237 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,410 | $11,135 | Not Implemented |
HO0237 # 02 Y:2000 | 02 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $91,200 | $1,000 | Not Implemented |
HO0237 # 03 Y:2000 | 03 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $8,731 | $1,000 | Not Implemented |
HO0237 # 04 Y:2000 | 04 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $5,780 | $6,240 | Not Implemented |
HO0237 # 05 Y:2000 | 05 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $7,800 | $5,000 | Not Implemented |
HO0237 # 06 Y:2000 | 06 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $2,880 | $480 | Not Implemented |
HO0237 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $9,464 | $7,000 | Not Implemented |
HO0237 # 08 Y:2000 | 08 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,520 | $1,000 | Implemented |
HO0237 # 09 Y:2000 | 09 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,980 | $200 | Not Implemented |
HO0235 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,960 | $11,729 | Not Implemented |
HO0235 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,410 | $15 | Not Implemented |
HO0235 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,255 | $600 | Implemented |
HO0235 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,126 | $5,000 | Implemented |
HO0235 # 05 Y:2000 | 05 | 2000 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $34,444 | $20,000 | Implemented |
HO0235 # 06 Y:2000 | 06 | 2000 | COMBINE UTILITY METERS | $4,142 | $6,000 | Not Implemented |
HO0235 # 07 Y:2000 | 07 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $115,354 | $4,000 | Not Implemented |
HO0235 # 08 Y:2000 | 08 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $4,200 | $375 | Implemented |
HO0235 # 09 Y:2000 | 09 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $524 | $2,500 | Implemented |
HO0233 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,704 | $12,835 | Not Implemented |
HO0233 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $822 | $800 | Not Implemented |
HO0233 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,080 | $0 | Implemented |
HO0233 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,361 | $400 | Implemented |
HO0233 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,490 | $2,000 | Implemented |
HO0233 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,314 | $90 | Not Implemented |
HO0233 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,000 | $8,023 | Not Implemented |