Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0497 # 11 Y:2005 | 11 | 2005 | USE SYNTHETIC LUBRICANT | $690 | $0 | Not Implemented |
AM0497 # 12 Y:2005 | 12 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $630 | $0 | Not Implemented |
TA0103 # 01 Y:2005 | 01 | 2005 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $12,460 | $8,170 | Not Implemented |
TA0103 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,365 | $2,620 | Implemented |
TA0103 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $14,113 | $0 | Implemented |
TA0103 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $0 | Implemented |
TA0103 # 05 Y:2005 | 05 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $1,070 | Implemented |
OK0718 # 01 Y:2005 | 01 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $12,970 | $500 | Implemented |
OK0718 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,021 | $40,875 | Not Implemented |
OK0718 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $5,034 | $459 | Not Implemented |
OK0718 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,239 | $8,030 | Not Implemented |
OK0718 # 05 Y:2005 | 05 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,243 | $5,175 | Not Implemented |
OK0718 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $1,343 | $1,693 | Implemented |
OK0718 # 07 Y:2005 | 07 | 2005 | USE OPTIMUM THICKNESS INSULATION | $2,162 | $1,710 | Implemented |
OK0718 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,226 | $66,500 | Implemented |
TA0102 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $20,445 | $0 | Implemented |
TA0102 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,027 | $110 | Implemented |
TA0102 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,700 | $1,800 | Implemented |
TA0102 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,170 | $0 | Not Implemented |
TA0102 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $148 | Not Implemented |
AM0496 # 01 Y:2005 | 01 | 2005 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $35,000 | $102,400 | Not Implemented |
AM0496 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,400 | $8,050 | Implemented |
AM0496 # 03 Y:2005 | 03 | 2005 | PAY UTILITY BILLS ON TIME | $1,448 | $0 | Implemented |
AM0496 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,400 | $5 | Implemented |
AM0496 # 05 Y:2005 | 05 | 2005 | USE SYNTHETIC LUBRICANT | $853 | $0 | Not Implemented |