IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0282 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,696 $375 Not Implemented
BD0282 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,494 $3,200 Not Implemented
BD0282 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Not Implemented
BD0282 # 10 Y:2005 10 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $212 $450 Not Implemented
AS0393 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $55,760 $2,000 Not Implemented
AS0393 # 02 Y:2005 02 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $29,744 $15,000 Not Implemented
AS0393 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,557 $210 Implemented
AS0393 # 04 Y:2005 04 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,674 $5,500 Not Implemented
AS0393 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,250 $12,278 Implemented
AS0393 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,527 $70 Implemented
AS0393 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,152 $1,260 Implemented
AS0393 # 08 Y:2005 08 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $968 $3,000 Implemented
AS0393 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $324 $350 Not Implemented
AS0393 # 10 Y:2005 10 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $108 $224 Implemented
LM0090 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,633 $0 Not Implemented
LM0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $429 $280 Implemented
LM0090 # 03 Y:2005 03 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,100 $0 Not Implemented
LM0090 # 04 Y:2005 04 2005 DEVELOP STANDARD OPERATING PROCEDURES $2,898 $2,000 Not Implemented
LM0090 # 05 Y:2005 05 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $45,000 $32,440 Not Implemented
LM0090 # 06 Y:2005 06 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $24,485 $2,000 Not Implemented
LM0090 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $2,790 $7,500 Not Implemented
MA0569 # 01 Y:2005 01 2005 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $67,271 $331,800 Not Implemented
MA0569 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,234 $7,312 Implemented
MA0569 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,082 $494 Implemented
MA0569 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $5,248 Implemented