Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0282 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $1,696 | $375 | Not Implemented |
BD0282 # 08 Y:2005 | 08 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,494 | $3,200 | Not Implemented |
BD0282 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $544 | $0 | Not Implemented |
BD0282 # 10 Y:2005 | 10 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $212 | $450 | Not Implemented |
AS0393 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $55,760 | $2,000 | Not Implemented |
AS0393 # 02 Y:2005 | 02 | 2005 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $29,744 | $15,000 | Not Implemented |
AS0393 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,557 | $210 | Implemented |
AS0393 # 04 Y:2005 | 04 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,674 | $5,500 | Not Implemented |
AS0393 # 05 Y:2005 | 05 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,250 | $12,278 | Implemented |
AS0393 # 06 Y:2005 | 06 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,527 | $70 | Implemented |
AS0393 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,152 | $1,260 | Implemented |
AS0393 # 08 Y:2005 | 08 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $968 | $3,000 | Implemented |
AS0393 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $324 | $350 | Not Implemented |
AS0393 # 10 Y:2005 | 10 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $108 | $224 | Implemented |
LM0090 # 01 Y:2005 | 01 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,633 | $0 | Not Implemented |
LM0090 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $429 | $280 | Implemented |
LM0090 # 03 Y:2005 | 03 | 2005 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,100 | $0 | Not Implemented |
LM0090 # 04 Y:2005 | 04 | 2005 | DEVELOP STANDARD OPERATING PROCEDURES | $2,898 | $2,000 | Not Implemented |
LM0090 # 05 Y:2005 | 05 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $45,000 | $32,440 | Not Implemented |
LM0090 # 06 Y:2005 | 06 | 2005 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $24,485 | $2,000 | Not Implemented |
LM0090 # 07 Y:2005 | 07 | 2005 | INSTALL SKYLIGHTS | $2,790 | $7,500 | Not Implemented |
MA0569 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $67,271 | $331,800 | Not Implemented |
MA0569 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,234 | $7,312 | Implemented |
MA0569 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $1,082 | $494 | Implemented |
MA0569 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $5,248 | Implemented |