IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,834

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0207 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,028 $12,825 Implemented
WM0207 # 02 Y:2024 02 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,759 $2,500 Not Implemented
WM0207 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,619 $4,084 Implemented
WM0207 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $3,129 $540 Not Implemented
WM0207 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,225 $1,100 Implemented
NT0020 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,491 $4,553 Implemented
NT0020 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,251 $0 Implemented
NT0020 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,277 $33,920 Not Implemented
NT0020 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $3,147 $11,909 Not Implemented
NT0020 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,816 $16,551 Not Implemented
NT0020 # 06 Y:2024 06 2024 APPLY FOR INVESTMENT INCENTIVES $52,462 $0 Implemented
NT0020 # 07 Y:2024 07 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $113,865 $96,040 Not Implemented
AS0565 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $583,260 $500 Implemented
AS0565 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $139,376 $1,265,613 Implemented
AS0565 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $89,587 $918,750 Not Implemented
AS0565 # 04 Y:2023 04 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,687 $3,351 Not Implemented
AS0565 # 05 Y:2023 05 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,336 $75 Implemented
AS0565 # 06 Y:2023 06 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $617 $312 Not Implemented
AS0565 # 07 Y:2023 07 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $454 $720 Implemented
AM0892 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $255 $1,000 n/a
AM0892 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $711 $506 n/a
AM0892 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $15,525 $136,100 n/a
AM0892 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $248 $800 n/a
LS0124 # 01 Y:2024 01 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $12,447 $6,930 Not Implemented
LS0124 # 02 Y:2024 02 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $24,894 $59,475 Not Implemented