IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0147 # 03 Y:2015 03 2015 REPAIR OR REPLACE STEAM TRAPS $1,127 $230 Implemented
TT0147 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $606 $567 Not Implemented
TT0147 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $430 $660 Not Implemented
TT0147 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,163 $2,500 Not Implemented
TT0147 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,166 $3,000 Not Implemented
TT0147 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $432 $63 Implemented
TT0147 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $151 $90 Implemented
TT0147 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $413 Implemented
TT0147 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,330 $16,510 Implemented
SU0377 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $514 Implemented
SU0377 # 02 Y:2015 02 2015 RECOVER AND REUSE WASTE MATERIAL $1,281,641 $1,000,000 Not Implemented
SU0377 # 03 Y:2015 03 2015 ELIMINATE/REDUCE AN OPERATION $4,112 $3,576 Implemented
SU0377 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,129 $998 Not Implemented
SU0377 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,883 $2,400 Implemented
SU0377 # 06 Y:2015 06 2015 OPTIMIZE PLANT POWER FACTOR $5,745 $12,259 Not Implemented
SU0377 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $5,256 Implemented
AM0672 # 01 Y:2015 01 2015 MAINTAIN MACHINES TO REDUCE LEAKS $149,400 $0 Implemented
AM0672 # 02 Y:2015 02 2015 USE POWER DURING OFF-PEAK PERIODS $50,930 $0 Not Implemented
AM0672 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,270 $18,105 Implemented
AM0672 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,480 $80,350 Implemented
AM0672 # 05 Y:2015 05 2015 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,615 $1,000 Implemented
AM0672 # 06 Y:2015 06 2015 USE SYNTHETIC LUBRICANT $8,670 $0 Not Implemented
AM0672 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,500 $210 Implemented
AM0672 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,645 $1,200 Implemented
AM0672 # 09 Y:2015 09 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,925 $1,000 Not Implemented