IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0328 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,170 $1,500 Implemented
OK0328 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $536 $2,080 Not Implemented
OK0328 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $519 $0 Implemented
OK0328 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41 $0 Implemented
OK0329 # 01 Y:1990 01 1990 INSTALL TURBULATORS $536 $1,550 Not Implemented
OK0329 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $57 Implemented
OK0329 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $1,671 $0 Implemented
OK0329 # 04 Y:1990 04 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $290 $0 Implemented
OK0329 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,363 $450 Implemented
OK0324 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,113 $0 Implemented
OK0324 # 02 Y:1990 02 1990 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $324 $0 Implemented
OK0324 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,971 $4,800 Not Implemented
OK0324 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $2,799 $10,000 Not Implemented
OK0324 # 05 Y:1990 05 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,755 $32,000 Not Implemented
OK0324 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $846 $1,050 Implemented
OK0319 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,141 $5,687 Implemented
OK0319 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $4,868 $2,380 Implemented
OK0319 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $59 $0 Not Implemented
OK0319 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,179 $0 Not Implemented
OK0319 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,512 $0 Implemented
OK0319 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $708 $900 Implemented
OK0317 # 01 Y:1990 01 1990 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $13,920 $31,500 Not Implemented
OK0317 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,265 $1,050 Implemented
OK0317 # 03 Y:1990 03 1990 INSTALL TURBULATORS $429 $675 Implemented
OK0318 # 01 Y:1990 01 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,141 $49,497 Implemented