IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0589 # 01 Y:2006 01 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $29,215 $95,420 Not Implemented
MA0589 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $13,600 $1,600 Not Implemented
MA0589 # 03 Y:2006 03 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,300 $4,000 Implemented
MA0589 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,608 $10,890 Not Implemented
MA0589 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,311 $3,565 Implemented
MA0589 # 06 Y:2006 06 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,951 $400 Implemented
MA0589 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,060 $1,800 Implemented
MA0589 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $187 $60 Implemented
MA0589 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $800 Implemented
MA0590 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,037 $56,931 Implemented
MA0590 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,269 $30,445 Not Implemented
MA0590 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,393 $12,255 Not Implemented
MA0590 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $3,295 Not Implemented
MA0590 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,630 $7,000 Not Implemented
MA0590 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,603 $3,312 Implemented
MA0590 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $1,000 Implemented
MA0590 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,100 $25,000 Not Implemented
MA0590 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $10,500 $2,000 Implemented
MA0590 # 10 Y:2006 10 2006 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $9,818 $6,420 Implemented
MA0590 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,286 $21,300 Not Implemented
MA0591 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,080 $82,975 Not Implemented
MA0591 # 02 Y:2006 02 2006 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $20,245 $77,830 Not Implemented
MA0591 # 03 Y:2006 03 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,565 $37,830 Implemented
MA0591 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,411 $1,650 Implemented
MA0591 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $5,675 $1,820 Implemented