Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0208 # 13 Y:2001 | 13 | 2001 | EXPAND OPERATIONS INTO UNUSED SPACE | $42,527 | $36,400 | Implemented |
WV0207 # 01 Y:2001 | 01 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $279,346 | $353,018 | Not Implemented |
WV0207 # 02 Y:2001 | 02 | 2001 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $24,920 | $76,400 | Not Implemented |
WV0207 # 03 Y:2001 | 03 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,228 | $9,955 | Not Implemented |
WV0207 # 04 Y:2001 | 04 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $47,889 | $2,760 | Implemented |
WV0207 # 05 Y:2001 | 05 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,319 | $36 | Implemented |
WV0207 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $108 | Implemented |
WV0207 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,825 | $54 | Implemented |
WV0207 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,703 | $924 | Not Implemented |
WV0207 # 09 Y:2001 | 09 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,111 | $3,360 | Not Implemented |
WV0207 # 10 Y:2001 | 10 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $706 | $1,590 | Not Implemented |
WV0207 # 11 Y:2001 | 11 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,892 | $6,990 | Not Implemented |
WV0207 # 12 Y:2001 | 12 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $43,495 | $2,000 | Implemented |
WV0207 # 13 Y:2001 | 13 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,816 | $300 | Implemented |
WV0207 # 14 Y:2001 | 14 | 2001 | USE OPTIMUM THICKNESS INSULATION | $4,005 | $2,580 | Implemented |
WV0207 # 15 Y:2001 | 15 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,841 | $10,820 | Not Implemented |
WV0207 # 16 Y:2001 | 16 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $24,641 | $1,440 | Implemented |
WV0207 # 17 Y:2001 | 17 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $397 | $1,444 | Implemented |
WV0207 # 18 Y:2001 | 18 | 2001 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $80 | $0 | Implemented |
WV0207 # 19 Y:2001 | 19 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $480 | $100 | Implemented |
WV0207 # 20 Y:2001 | 20 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $18,100 | $4,320 | Implemented |
WV0207 # 21 Y:2001 | 21 | 2001 | METER WASTE WATER | $13,220 | $1,200 | Implemented |
WV0207 # 22 Y:2001 | 22 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $20,000 | $30,000 | Not Implemented |
WV0206 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $346 | $459 | Not Implemented |
WV0206 # 02 Y:2001 | 02 | 2001 | USE SYNTHETIC LUBRICANT | $120 | $118 | Implemented |