IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0529 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $15,152 $66,000 n/a
MA0529 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,301 $13,950 n/a
MA0529 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,609 $30,000 Not Implemented
MA0529 # 05 Y:2003 05 2003 PAY UTILITY BILLS ON TIME $2,902 $345 Not Implemented
MA0529 # 06 Y:2003 06 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,837 $827 Implemented
MA0529 # 07 Y:2003 07 2003 REPAIR AND ELIMINATE STEAM LEAKS $295 $600 Implemented
SU0157 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $45,993 $0 Not Implemented
SU0157 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,969 $11,310 Not Implemented
SU0157 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,728 $2,468 Not Implemented
SU0157 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,835 $0 Implemented
SU0157 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,647 $8,000 Not Implemented
SU0157 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,020 $7,486 Not Implemented
SU0157 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,147 $0 Implemented
SU0157 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $858 $0 Not Implemented
SU0157 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $849 $640 Not Implemented
SU0157 # 10 Y:2003 10 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $803 $406 Not Implemented
SU0157 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $376 $558 Implemented
MA0528 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,973 $48,190 Not Implemented
MA0528 # 02 Y:2003 02 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,180 $16,000 Not Implemented
MA0528 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,167 $9,862 Not Implemented
MA0528 # 04 Y:2003 04 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,752 $0 Implemented
MA0528 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $2,103 $1,325 Implemented
IA0312 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,964 $779 Not Implemented
IA0312 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $25 Not Implemented
IA0312 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $58,932 $136,000 Not Implemented