IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0038 # 04 Y:1994 04 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,504 $8,400 Not Implemented
NC0038 # 05 Y:1994 05 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $705 $1,624 Not Implemented
NC0038 # 06 Y:1994 06 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,775 $7,000 Implemented
NC0038 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $9,420 $1,500 Implemented
NC0038 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,154 $2,128 Implemented
NC0039 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,241 $2,018 Implemented
NC0039 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,052 $3,850 Not Implemented
NC0039 # 03 Y:1994 03 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,432 $1,500 Not Implemented
NC0039 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,710 $600 Not Implemented
NC0039 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,600 $420 Not Implemented
NC0039 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,307 $2,500 Not Implemented
NC0039 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,306 $5,070 Not Implemented
NC0039 # 08 Y:1994 08 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $570 Not Implemented
NC0039 # 09 Y:1994 09 1994 USE POWER DURING OFF-PEAK PERIODS $8,928 $0 Implemented
NC0039 # 10 Y:1994 10 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,760 $16,000 Not Implemented
NC0039 # 11 Y:1994 11 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,900 $500 Not Implemented
NC0037 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $360 Not Implemented
NC0037 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,656 $28,570 Not Implemented
NC0037 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,535 $4,662 Not Implemented
NC0037 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $420 $300 Not Implemented
NC0037 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $4,967 $536 Not Implemented
NC0035 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,391 $1,620 Implemented
NC0035 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,132 $700 Not Implemented
NC0035 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,131 $500 Not Implemented
NC0035 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $824 $0 Implemented