IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,413

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0973 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $1,850 Implemented
GT0973 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $25,481 $338,242 Not Implemented
GT0973 # 07 Y:2024 07 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $27,850 $175,000 Not Implemented
UU0239 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,184 $8,000 Implemented
UU0239 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $18,178 $2,000 Implemented
UU0239 # 03 Y:2024 03 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $9,905 $9,905 Implemented
UU0239 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $6,144 $7,887 Implemented
UU0239 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,050 $1,400 Not Implemented
UU0239 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,011 $3,011 Not Implemented
AM0899 # 01 Y:2024 01 2024 MAINTAIN MACHINES TO REDUCE LEAKS $4,537 $5,000 n/a
AM0899 # 02 Y:2024 02 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $711 $23,638 n/a
AM0899 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $23,352 $530,400 n/a
AM0899 # 04 Y:2024 04 2024 REDUCE FLUID FLOW RATES $1,045 $3,000 n/a
AM0899 # 05 Y:2024 05 2024 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $254 $1,314 n/a
SD0646 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $678 $180 Implemented
SD0646 # 02 Y:2024 02 2024 ADJUST BURNERS FOR EFFICIENT OPERATION $16,626 $6,076 Implemented
SD0646 # 03 Y:2024 03 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $503 $614 Implemented
SD0646 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,600 $250,043 Implemented
SD0646 # 05 Y:2024 05 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $8,600 $0 Implemented
SD0646 # 06 Y:2024 06 2024 ADOPT IN-HOUSE MATERIAL GENERATION $32,881 $97,356 Implemented
SD0646 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $898 $3,115 Not Implemented
SD0646 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,221 $10,759 Implemented
SD0646 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $276 $932 Implemented
SD0646 # 10 Y:2024 10 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,515 $6,200 Implemented
SD0646 # 11 Y:2024 11 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $516 $250 Implemented