Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0148 # 06 Y:1997 | 06 | 1997 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $10,000 | $10,000 | Implemented |
HO0148 # 07 Y:1997 | 07 | 1997 | APPLY FOR INVESTMENT INCENTIVES | $8,676 | $100 | Implemented |
HO0146 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $238 | $234 | Not Implemented |
HO0146 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $616 | $500 | Implemented |
HO0146 # 03 Y:1997 | 03 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,400 | $6,500 | Not Implemented |
HO0146 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $16,827 | $7,700 | Implemented |
HO0146 # 05 Y:1997 | 05 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $15,000 | $200 | Not Implemented |
HO0146 # 06 Y:1997 | 06 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $104,000 | $0 | Implemented |
HO0146 # 07 Y:1997 | 07 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $53,760 | $0 | Implemented |
HO0145 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,073 | $6,276 | Not Implemented |
HO0145 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $327 | $1,433 | Not Implemented |
HO0145 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $661 | $500 | Implemented |
HO0145 # 04 Y:1997 | 04 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,805 | $17,760 | Not Implemented |
HO0145 # 05 Y:1997 | 05 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,170 | $500 | Not Implemented |
HO0145 # 06 Y:1997 | 06 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $10,296 | $10,000 | Not Implemented |
HO0144 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,645 | $4,563 | Implemented |
HO0144 # 02 Y:1997 | 02 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,208 | $1,900 | Not Implemented |
HO0144 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,903 | $1,800 | Implemented |
HO0144 # 04 Y:1997 | 04 | 1997 | MINIMIZE WATER USAGE | $3,510 | $2,718 | Not Implemented |
HO0144 # 05 Y:1997 | 05 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $20,000 | $75,000 | Not Implemented |
HO0144 # 06 Y:1997 | 06 | 1997 | MOVE PRODUCT USING MECHANICAL MEANS | $3,745 | $4,500 | Not Implemented |
HO0143 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,952 | $4,592 | Implemented |
HO0143 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $618 | $1,160 | Implemented |
HO0143 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $679 | $400 | Not Implemented |
HO0143 # 04 Y:1997 | 04 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,568 | $6,500 | Implemented |