IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0241 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $510 $540 Implemented
AM0241 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $120 Implemented
AM0241 # 04 Y:1995 04 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $315 $124 Implemented
AM0241 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $220 $250 Implemented
UD0458 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $11,292 $25,000 Implemented
UD0458 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,105 $70,000 Not Implemented
UD0458 # 03 Y:1995 03 1995 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $23,747 $5,000 Implemented
UD0458 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $12,040 $30,000 Implemented
UD0458 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,553 $23,127 Implemented
UD0458 # 06 Y:1995 06 1995 KEEP LAMPS AND REFLECTORS CLEAN $2,914 $1,680 Implemented
UD0458 # 07 Y:1995 07 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,344 $0 Not Implemented
UD0458 # 08 Y:1995 08 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,442 $600 Implemented
MA0333 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,356 $30,750 Not Implemented
MA0333 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $4,592 $9,500 Implemented
MA0333 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,119 $1,800 Not Implemented
MA0333 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $588 $800 Implemented
MA0333 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $412 $461 Implemented
ME0157 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,120 $16,036 Not Implemented
ME0157 # 02 Y:1995 02 1995 USE OPTIMUM THICKNESS INSULATION $2,340 $870 Implemented
ME0157 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $300 Implemented
ME0157 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $800 Implemented
ME0157 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,175 $3,519 Implemented
ME0157 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,050 $315 Not Implemented
ME0157 # 07 Y:1995 07 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $736 $0 Implemented
ME0157 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $455 $400 Implemented