IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0495 # 07 Y:1996 07 1996 TREAT AND REUSE RINSE WATERS $3,524 $40,000 Implemented
ME0185 # 01 Y:1996 01 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,254 $2,600 Implemented
ME0185 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,498 $5,100 Implemented
ME0185 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,255 $1,200 Implemented
ME0185 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $4,144 $5,290 Implemented
ME0185 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,854 $1,050 Implemented
ME0185 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,128 $70 Implemented
ME0185 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $655 $1,000 Implemented
ME0185 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $660 $1,000 Implemented
ME0185 # 09 Y:1996 09 1996 CLOSE OFF UNNEEDED STEAM LINES $812 $1,850 Implemented
NC0085 # 01 Y:1996 01 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $144 $0 Not Implemented
NC0085 # 02 Y:1996 02 1996 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,587 $25,400 Not Implemented
NC0085 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $738 $600 Implemented
NC0085 # 04 Y:1996 04 1996 CHECK FOR ACCURACY OF UTILITY / POWER METERS $594 $0 Not Implemented
NC0085 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $910 $520 Implemented
NC0085 # 06 Y:1996 06 1996 USE PHOTOCELL CONTROLS $1,271 $0 Not Implemented
NC0085 # 07 Y:1996 07 1996 USE LESS WASTEFUL PACKAGING $437 $0 Implemented
GT0584 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,430 $40,190 Implemented
GT0584 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,510 $22,150 Implemented
GT0584 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $350 Implemented
GT0584 # 04 Y:1996 04 1996 UPGRADE CONTROLS ON COMPRESSORS $34,600 $7,000 Not Implemented
GT0584 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,600 $0 Not Implemented
GT0584 # 06 Y:1996 06 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $52,000 $0 Implemented
GT0584 # 07 Y:1996 07 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,300 $0 Implemented
GT0584 # 08 Y:1996 08 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,150 $0 Implemented