IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0197 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $350 Implemented
SD0197 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,535 $2,000 Implemented
SD0197 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,682 $7,000 Not Implemented
SD0197 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,149 $23,968 Implemented
SD0197 # 06 Y:1998 06 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $13,931 $10,620 Not Implemented
SD0197 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,516 $2,000 Implemented
SD0197 # 08 Y:1998 08 1998 WASH AND REUSE RAGS ON-SITE $711 $600 Implemented
SD0197 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,350 $1,000 Implemented
OD0107 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,066 $7,697 Implemented
OD0107 # 02 Y:1998 02 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,580 $100 Implemented
OD0107 # 03 Y:1998 03 1998 REPAIR OR REPLACE STEAM TRAPS $280 $780 Implemented
MA0411 # 01 Y:1998 01 1998 RECOVER AND REUSE WASTE MATERIAL $171,700 $200,000 Not Implemented
MA0411 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,333 $225 Implemented
MA0411 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,128 $9,975 Not Implemented
MA0411 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $517 Not Implemented
MA0411 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $255 Not Implemented
MA0411 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $140 $140 Implemented
MO0227 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,155 $3,700 Not Implemented
MO0227 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $4,071 $9,000 Not Implemented
MO0227 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,132 $6,768 Implemented
MO0227 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $276 Implemented
MO0227 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,109 $139 Implemented
MO0227 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,138 $13,876 Implemented
MO0227 # 07 Y:1998 07 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $469 $0 Implemented
MO0227 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $388,472 $100,000 Not Implemented