IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1052 # 06 Y:2023 06 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,801 $16,950 Not Implemented
DL0217 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,180 $0 Implemented
DL0217 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,621 $0 Implemented
DL0217 # 03 Y:2023 03 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $112,250 $0 Not Implemented
DL0217 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,120 $0 Implemented
DL0217 # 05 Y:2023 05 2023 REDUCE VENTILATION AIR $29,580 $0 Implemented
DL0217 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30,600 $0 Implemented
DL0217 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $2,650 $0 Implemented
DL0217 # 08 Y:2023 08 2023 REDUCE VENTILATION AIR $1,715 $750 Implemented
DL0217 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,708 $15,000 Not Implemented
DL0217 # 10 Y:2023 10 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,110 $5,000 Not Implemented
DL0217 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,318 $4,100 Implemented
DL0217 # 12 Y:2023 12 2023 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,950 $25,000 Not Implemented
DL0217 # 13 Y:2023 13 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,390 $11,744 Not Implemented
SD0627 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $634 $2,128 Not Implemented
SD0627 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,041 $48,250 Not Implemented
SD0627 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,383 $164,701 Not Implemented
SD0627 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,584 $7,660 Not Implemented
SD0627 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,101 $9,714 Not Implemented
SD0627 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,072 $2,788 Not Implemented
SD0627 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $776 $1,200 Not Implemented
SD0627 # 08 Y:2023 08 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,281 $41,842 Not Implemented
SD0627 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $74,599 $327,726 Not Implemented
MZ0341 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,080 $9,000 n/a
MZ0341 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,839 $3,000 n/a