IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0067 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $973 $139 Implemented
KU0067 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,623 $2,350 Not Implemented
KU0067 # 05 Y:1982 05 1982 INSULATE BARE EQUIPMENT $675 $100 Not Implemented
KU0067 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $420 $400 Not Implemented
KU0067 # 07 Y:1982 07 1982 INSTALL AUTOMATIC STACK DAMPER $851 $1,630 Not Implemented
KU0067 # 08 Y:1982 08 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $798 $950 Not Implemented
KU0067 # 09 Y:1982 09 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $173 $31 Implemented
KU0061 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,078 $3,361 Not Implemented
KU0061 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,765 $1,000 Not Implemented
KU0061 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,549 $1,200 Not Implemented
KU0061 # 04 Y:1982 04 1982 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,660 $3,800 Not Implemented
KU0061 # 05 Y:1982 05 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,767 $9,000 Not Implemented
KU0062 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,547 $2,445 Not Implemented
KU0062 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,446 $800 Not Implemented
KU0062 # 03 Y:1982 03 1982 INSTALL AUTOMATIC STACK DAMPER $485 $576 Not Implemented
KU0062 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $370 $272 Implemented
KU0063 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,441 $5,865 Not Implemented
KU0063 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,532 $230,000 Implemented
KU0063 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $2,215 $4,000 Not Implemented
KU0063 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $670 $0 Not Implemented
KU0063 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $82 Implemented
KU0063 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,276 $450 Not Implemented
KU0063 # 07 Y:1982 07 1982 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $17,053 $57,400 Not Implemented
KU0064 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,639 $8,528 Not Implemented
KU0064 # 02 Y:1982 02 1982 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,021 $5,480 Not Implemented