Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0506 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,316 | $41,520 | Implemented |
UF0164 # 01 Y:1996 | 01 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $97,999 | $5,544 | Not Implemented |
UF0164 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,368 | $16,471 | Not Implemented |
UF0164 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,265 | $3,303 | Implemented |
UF0164 # 04 Y:1996 | 04 | 1996 | MOVE BOILER TO MORE EFFICIENT LOCATION | $10,185 | $0 | Implemented |
UF0164 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,142 | $600 | Implemented |
UF0164 # 06 Y:1996 | 06 | 1996 | AIR CONDITION ONLY SPACE NECESSARY | $8,857 | $880 | Not Implemented |
UF0164 # 07 Y:1996 | 07 | 1996 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,240 | $0 | Implemented |
MA0375 # 01 Y:1996 | 01 | 1996 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,468 | $4,677 | Not Implemented |
MA0375 # 02 Y:1996 | 02 | 1996 | UPGRADE CONTROLS ON COMPRESSORS | $2,121 | $1,100 | Implemented |
MA0375 # 03 Y:1996 | 03 | 1996 | USE SYNTHETIC LUBRICANT | $329 | $0 | Not Implemented |
MA0375 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $456 | $157 | Implemented |
MA0375 # 05 Y:1996 | 05 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $444 | $290 | Implemented |
MA0375 # 06 Y:1996 | 06 | 1996 | INSTALL / REPAIR INSULATION ON STEAM LINES | $683 | $1,590 | Not Implemented |
MA0375 # 07 Y:1996 | 07 | 1996 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $310 | $1,888 | Not Implemented |
MA0375 # 08 Y:1996 | 08 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,823 | $47,265 | Not Implemented |
MA0375 # 09 Y:1996 | 09 | 1996 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $9,036 | $6,000 | Not Implemented |
MA0375 # 10 Y:1996 | 10 | 1996 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $1,125 | $400 | Not Implemented |
MA0375 # 11 Y:1996 | 11 | 1996 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $10,877 | $31,500 | Not Implemented |
MA0375 # 12 Y:1996 | 12 | 1996 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $28,830 | $97,000 | Not Implemented |
GT0601 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,440 | $12,710 | Implemented |
GT0601 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,643 | $350 | Implemented |
GT0601 # 03 Y:1996 | 03 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,579 | $2,000 | Not Implemented |
GT0601 # 04 Y:1996 | 04 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $45,800 | $10,000 | Not Implemented |
GT0601 # 05 Y:1996 | 05 | 1996 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,830 | $6,000 | Implemented |