Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0231 # 08 Y:2012 | 08 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,835 | $4,691 | Not Implemented |
MI0231 # 09 Y:2012 | 09 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,123 | $1,160 | Implemented |
MI0231 # 10 Y:2012 | 10 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,549 | $843 | Implemented |
MI0231 # 11 Y:2012 | 11 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,120 | $1,498 | Not Implemented |
UD0868 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,535 | $0 | Implemented |
UD0868 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,026 | $107,140 | Not Implemented |
UD0868 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,542 | $1,350 | Implemented |
UD0868 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,282 | $0 | Implemented |
UD0868 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $2,154 | $380 | Not Implemented |
UD0868 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,591 | $2,000 | Not Implemented |
UD0868 # 07 Y:2012 | 07 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $682 | $1,000 | Implemented |
UD0868 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,792 | $1,000 | Implemented |
UD0868 # 09 Y:2012 | 09 | 2012 | COVER OPEN TANKS | $1,393 | $800 | Not Implemented |
UD0868 # 10 Y:2012 | 10 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,355 | $2,415 | Not Implemented |
UD0868 # 11 Y:2012 | 11 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,912 | $5,400 | Implemented |
UD0868 # 12 Y:2012 | 12 | 2012 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $665 | $2,000 | Not Implemented |
BS0010 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $289 | $630 | Not Implemented |
BS0010 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $222 | $512 | Implemented |
BS0010 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,826 | $750 | Not Implemented |
BS0010 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $645 | $251 | Implemented |
BS0010 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $70 | $60 | Not Implemented |
MAS032 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $8,920 | $8,000 | Not Implemented |
MAS032 # 02 Y:2012 | 02 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,141 | $8,000 | Not Implemented |
MAS032 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,897 | $38,000 | Not Implemented |
MAS032 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,230 | $20,000 | Not Implemented |