IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0736 # 04 Y:2016 04 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,340 $500 n/a
LE0426 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,840 $1,000 Implemented
LE0426 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,562 $2,000 Implemented
LE0426 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $102,120 $52,500 Not Implemented
LE0426 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $780 Implemented
LE0426 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,070 $3,000 Not Implemented
LE0426 # 06 Y:2016 06 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,120 $35,000 Not Implemented
LE0426 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,376 $16,500 Not Implemented
LE0426 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $454 $1,300 Not Implemented
LE0426 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $13,747 Implemented
LE0426 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $780 Implemented
LE0426 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $12,000 Implemented
MA0765 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,910 $95,901 Not Implemented
MA0765 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $15,004 $12,000 Implemented
MA0765 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,000 $1,000 Implemented
MA0765 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,076 $4,235 Not Implemented
MA0765 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,576 $1,152 Implemented
MA0765 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $1,080 $900 Implemented
UK1609 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $54,548 $0 Not Implemented
UK1609 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,223 $3,000 Implemented
UK1609 # 03 Y:2016 03 2016 INSULATE FEEDWATER TANK $380 $140 Not Implemented
UK1609 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $657 $0 Implemented
BS0089 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,075 $353 Not Implemented
BS0089 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $7,566 $6,400 Not Implemented
BS0089 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,855 $654 Not Implemented