Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0106 # 07 Y:2005 | 07 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $756 | $1,536 | Not Implemented |
MI0105 # 01 Y:2005 | 01 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $81,540 | $120,000 | Not Implemented |
MI0105 # 02 Y:2005 | 02 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $44,261 | $320 | Not Implemented |
MI0105 # 03 Y:2005 | 03 | 2005 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $26,325 | $32,000 | Not Implemented |
MI0105 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,112 | $0 | Not Implemented |
MI0105 # 05 Y:2005 | 05 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,381 | $14,100 | Not Implemented |
MI0105 # 06 Y:2005 | 06 | 2005 | DISCONNECT BALLASTS | $4,619 | $0 | Not Implemented |
UF0361 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,815 | $9 | Implemented |
UF0361 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,264 | $1 | Implemented |
UF0361 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,324 | $2 | Implemented |
UF0361 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,002 | $2 | Implemented |
UF0361 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,934 | $0 | Implemented |
UF0361 # 06 Y:2005 | 06 | 2005 | RECYCLE FLUORESCENT LAMPS | $574 | $3 | Not Implemented |
MI0104 # 01 Y:2005 | 01 | 2005 | HEAT WATER WITH EXHAUST HEAT | $315,984 | $128,000 | Not Implemented |
MI0104 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,384 | $1,300 | Not Implemented |
MI0104 # 03 Y:2005 | 03 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,889 | $600 | Not Implemented |
MI0104 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,821 | $3,010 | Not Implemented |
MI0104 # 05 Y:2005 | 05 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,246 | $10,198 | Not Implemented |
MI0104 # 06 Y:2005 | 06 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,160 | $5,060 | Not Implemented |
UF0360 # 01 Y:2005 | 01 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,102 | $34,362 | Implemented |
UF0360 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,418 | $744 | Implemented |
UF0360 # 03 Y:2005 | 03 | 2005 | CLEAN CONDENSER TUBES | $2,414 | $12,044 | Implemented |
UF0360 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,698 | $8,619 | Implemented |
UF0360 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $988 | $0 | Implemented |
UF0360 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,405 | $0 | Not Implemented |