IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0106 # 07 Y:2005 07 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $756 $1,536 Not Implemented
MI0105 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $81,540 $120,000 Not Implemented
MI0105 # 02 Y:2005 02 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $44,261 $320 Not Implemented
MI0105 # 03 Y:2005 03 2005 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $26,325 $32,000 Not Implemented
MI0105 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,112 $0 Not Implemented
MI0105 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,381 $14,100 Not Implemented
MI0105 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $4,619 $0 Not Implemented
UF0361 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,815 $9 Implemented
UF0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,264 $1 Implemented
UF0361 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,324 $2 Implemented
UF0361 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,002 $2 Implemented
UF0361 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,934 $0 Implemented
UF0361 # 06 Y:2005 06 2005 RECYCLE FLUORESCENT LAMPS $574 $3 Not Implemented
MI0104 # 01 Y:2005 01 2005 HEAT WATER WITH EXHAUST HEAT $315,984 $128,000 Not Implemented
MI0104 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,384 $1,300 Not Implemented
MI0104 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,889 $600 Not Implemented
MI0104 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,821 $3,010 Not Implemented
MI0104 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,246 $10,198 Not Implemented
MI0104 # 06 Y:2005 06 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,160 $5,060 Not Implemented
UF0360 # 01 Y:2005 01 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,102 $34,362 Implemented
UF0360 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,418 $744 Implemented
UF0360 # 03 Y:2005 03 2005 CLEAN CONDENSER TUBES $2,414 $12,044 Implemented
UF0360 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,698 $8,619 Implemented
UF0360 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $988 $0 Implemented
UF0360 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,405 $0 Not Implemented