IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0198 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $782 $416 Not Implemented
WV0198 # 07 Y:2000 07 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,060 $0 Implemented
WV0198 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,141 $23 Implemented
WV0198 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $15,135 $20,000 Not Implemented
WV0198 # 10 Y:2000 10 2000 CLEAR AND RENT EXISTING SPACE $6,000 $100 Not Implemented
WV0198 # 11 Y:2000 11 2000 INSTALL SENSORS TO DETECT DEFECTS $8,580 $125 Implemented
HO0231 # 01 Y:2000 01 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,008 $0 Implemented
HO0231 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,854 $5,000 Implemented
HO0231 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $5,519 $9,992 Implemented
HO0231 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $3,996 $5,204 Not Implemented
HO0231 # 05 Y:2000 05 2000 MOVE BOILER TO MORE EFFICIENT LOCATION $1,070 $200 Not Implemented
HO0231 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,350 $3,000 Not Implemented
HO0231 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,373 $2,790 Implemented
HO0231 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $398 $0 Implemented
HO0231 # 09 Y:2000 09 2000 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $85,091 $4,000 Not Implemented
HO0231 # 10 Y:2000 10 2000 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $73,575 $0 Implemented
HO0231 # 11 Y:2000 11 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $15,600 $300 Not Implemented
HO0231 # 12 Y:2000 12 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $15,600 $3,000 Implemented
HO0231 # 13 Y:2000 13 2000 INSTALL SYSTEM TO COLLECT SCRAP $12,375 $1,075 Implemented
HO0231 # 14 Y:2000 14 2000 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $5,850 $20,000 Not Implemented
HO0231 # 15 Y:2000 15 2000 IMPROVE SPACE COMFORT CONDITIONING $2,880 $200 Not Implemented
HO0231 # 16 Y:2000 16 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,980 $20,017 Not Implemented
HO0231 # 17 Y:2000 17 2000 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $79,092 $7,100 Implemented
HO0231 # 18 Y:2000 18 2000 RECOVER AND REUSE WASTE MATERIAL $7,809 $2,360 Implemented
HO0231 # 19 Y:2000 19 2000 TREAT AND REUSE RINSE WATERS $4,617 $10,100 Not Implemented