IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0611 # 03 Y:2001 03 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $29,561 $1,200 Implemented
UD0611 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $23,249 $4,000 Implemented
UD0611 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $17,705 $3,000 Implemented
UD0611 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,096 $0 Not Implemented
UD0611 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,016 $0 Implemented
UD0611 # 08 Y:2001 08 2001 RECOVER WASTE HEAT FROM EQUIPMENT $4,371 $1,000 Implemented
UD0611 # 09 Y:2001 09 2001 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,773 $700 Implemented
UD0611 # 10 Y:2001 10 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $500 Not Implemented
SD0266 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,560 $5,000 Not Implemented
SD0266 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $8,646 $16,500 Not Implemented
SD0266 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,892 $210 Not Implemented
SD0266 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,776 $1,500 Not Implemented
SD0266 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $517 $100 Not Implemented
SD0266 # 06 Y:2001 06 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $158,100 $114,362 Not Implemented
SD0266 # 07 Y:2001 07 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $52,020 $10,000 Not Implemented
SD0266 # 08 Y:2001 08 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $6,772 $3,400 Implemented
MS0178 # 01 Y:2001 01 2001 AIR CONDITION ONLY SPACE NECESSARY $133,472 $38,250 Not Implemented
MS0178 # 02 Y:2001 02 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $23,451 $3,230 Not Implemented
MS0178 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $8,374 $3,053 Not Implemented
MS0178 # 04 Y:2001 04 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,493 $1,893 Implemented
MS0178 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $964 $1,459 Not Implemented
MS0178 # 06 Y:2001 06 2001 EXPAND OPERATIONS INTO UNUSED SPACE $583,296 $1,050,000 Not Implemented
MS0178 # 07 Y:2001 07 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $122,949 $105,000 Implemented
WI0388 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $10,705 $54,000 Not Implemented
WI0388 # 02 Y:2001 02 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,134 $0 Not Implemented