IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94,135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0796 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,427 $1,750 Not Implemented
GT0796 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,639 $9,925 Not Implemented
GT0796 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,051 $50,551 Implemented
GT0796 # 08 Y:2004 08 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $792 $1,910 Not Implemented
GT0791 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,805 $1,000 n/a
GT0791 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $1,576 $628 n/a
GT0791 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,304 $400 n/a
GT0791 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $5,322 $2,727 n/a
GT0791 # 05 Y:2004 05 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $74,318 $31,600 n/a
GT0791 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $800 n/a
GT0791 # 07 Y:2004 07 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,622 $17,600 n/a
GT0791 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $607 $1,112 n/a
GT0791 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,041 $18,139 n/a
GT0791 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $6,882 n/a
GT0791 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,540 $14,700 n/a
OK0701 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $11,182 $123,420 Implemented
OK0701 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,527 $3,807 Not Implemented
OK0701 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $43,354 $1,623 Implemented
OK0701 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $8,850 Implemented
OK0701 # 05 Y:2005 05 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,082 $13,500 Not Implemented
OK0701 # 06 Y:2005 06 2005 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,169 $275 Not Implemented
IC0089 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $67,444 $15,000 Not Implemented
IC0089 # 02 Y:2004 02 2004 RECOVER MECHANICAL ENERGY $11,613 $3,600 Not Implemented
IC0089 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,900 $0 Not Implemented
IC0089 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,592 $15,794 Not Implemented