Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0779 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,642 | $5,350 | Not Implemented |
GT0779 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $300 | Implemented |
GT0779 # 05 Y:2004 | 05 | 2004 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,090 | $4,600 | Not Implemented |
GT0779 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,561 | $320 | Not Implemented |
GT0779 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $303 | $1,000 | Implemented |
SU0180 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,507 | $0 | Implemented |
SU0180 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,590 | $0 | Implemented |
SU0180 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,884 | $0 | Implemented |
SU0180 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $0 | Implemented |
SU0180 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,647 | $712 | Not Implemented |
SU0180 # 06 Y:2004 | 06 | 2004 | ADD AREA LIGHTING SWITCHES | $291 | $680 | Implemented |
UM0248 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $18,156 | $2,400 | Not Implemented |
UM0248 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,467 | $2,000 | Implemented |
UM0248 # 03 Y:2004 | 03 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,420 | $920 | Not Implemented |
UM0248 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $225 | Implemented |
UM0248 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,550 | $1,000 | Not Implemented |
UD0690 # 01 Y:2004 | 01 | 2004 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $24,929 | $9,930 | Not Implemented |
UD0690 # 02 Y:2004 | 02 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,916 | $9,244 | Not Implemented |
UD0690 # 03 Y:2004 | 03 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,576 | $7,366 | Implemented |
UD0690 # 04 Y:2004 | 04 | 2004 | REDUCE FLUID FLOW RATES | $4,171 | $2,400 | Implemented |
UD0690 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,955 | $5,625 | Not Implemented |
UD0690 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,580 | $0 | Implemented |
UD0690 # 07 Y:2004 | 07 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,533 | $2,240 | Not Implemented |
UD0690 # 08 Y:2004 | 08 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,197 | $86 | Not Implemented |
UD0690 # 09 Y:2004 | 09 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,085 | $6 | Not Implemented |