IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0212 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $1,503 $498 Implemented
TN0217 # 01 Y:1984 01 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,259 $42,740 Not Implemented
TN0217 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $24,926 $1,300 Implemented
TN0217 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $22,604 $1,425 Implemented
TN0217 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,424 $1,200 Implemented
TN0217 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,488 $0 Not Implemented
TN0217 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $0 Implemented
TN0217 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $50 Implemented
TN0218 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $8,908 $15,000 Not Implemented
TN0218 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,382 $0 Not Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,746 $180 Not Implemented
TN0218 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,078 $4,350 Not Implemented
TN0218 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $758 $0 Not Implemented
TN0218 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $90 Implemented
TN0214 # 01 Y:1984 01 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,671 $29,800 Not Implemented
TN0214 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,705 $1,000 Not Implemented
TN0214 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,407 $2,100 Not Implemented
TN0214 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $480 $627 Not Implemented
TN0214 # 05 Y:1984 05 1984 INSTALL SET-BACK TIMERS $826 $1,850 Not Implemented
TN0215 # 01 Y:1984 01 1984 COVER OPEN TANKS $10,482 $3,500 Implemented
TN0215 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $12,107 $1,000 Implemented
TN0215 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,092 $300 Implemented
TN0215 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,311 $175 Implemented
TN0215 # 05 Y:1984 05 1984 REDUCE FLUID FLOW RATES $5,029 $1,680 Not Implemented