IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0006 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $151,941 $2,205,000 Not Implemented
WM0200 # 01 Y:2023 01 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,579 $10,000 Not Implemented
WM0200 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $4,500 $12,375 Not Implemented
WM0200 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,827 $3,344 Implemented
WM0200 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,847 $800 Implemented
WM0200 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,426 $750 Implemented
WM0200 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,288 Implemented
SF0599 # 03 Y:2023 03 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,680 $219,094 Not Implemented
SF0599 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,031 $15,452 Implemented
SF0599 # 05 Y:2023 05 2023 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $52,766 $303,600 Not Implemented
SF0599 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $8,702 $0 Implemented
SF0599 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,633 $13,122 Implemented
UC2304 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,182 $2,800 Not Implemented
UC2304 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,346 $16,122 Not Implemented
UC2304 # 03 Y:2023 03 2023 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $38,532 $50,758 Not Implemented
UC2304 # 04 Y:2023 04 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $17,250 $148,500 Not Implemented
UC2304 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,740 $26,230 Not Implemented
UC2304 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,863 $2,882 Not Implemented
UC2304 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $99 $260 Not Implemented
UC2304 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $79,562 $411,323 Not Implemented
ORC008 # 01 Y:2023 01 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,876 $500 Not Implemented
ORC008 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $474 $100 Not Implemented
ORC008 # 03 Y:2023 03 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $959 $1,500 Not Implemented
ORC008 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,527 $4,000 Not Implemented
ORC008 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $668 $5,000 Not Implemented