IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0461 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $360 Implemented
WI0461 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Not Implemented
WI0461 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,930 $5,784 Not Implemented
WI0461 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $1,227 Not Implemented
SU0179 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,807 $0 Not Implemented
SU0179 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $543 $0 Not Implemented
SU0179 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,108 $6,327 Not Implemented
SU0179 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,671 $2,665 Not Implemented
SU0179 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $3,469 $6,227 Not Implemented
OK0682 # 01 Y:2004 01 2004 INSTALL SET-BACK TIMERS $1,572 $163 Implemented
OK0682 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $906 $6,187 Not Implemented
OK0682 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $200 Not Implemented
OK0682 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $738 $682 Implemented
OK0682 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $419 $3,000 Implemented
OK0682 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $132 $92 Not Implemented
OK0682 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,374 $15,000 Not Implemented
OK0682 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,455 $2,134 Not Implemented
OK0682 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $438 Implemented
OK0682 # 10 Y:2004 10 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,483 $1,200 Implemented
OK0682 # 11 Y:2004 11 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,729 $130 Not Implemented
OK0682 # 12 Y:2004 12 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,392 $10,000 Implemented
OK0682 # 13 Y:2004 13 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $0 Implemented
LM0071 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,818 $1,176 Not Implemented
LM0071 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80,552 $121,600 Not Implemented
LM0071 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,163 $945 Implemented