Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0482 # 04 Y:2005 | 04 | 2005 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $6,615 | $13,500 | Not Implemented |
WI0482 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,791 | $640 | Not Implemented |
WI0482 # 06 Y:2005 | 06 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,495 | $500 | Implemented |
WI0482 # 07 Y:2005 | 07 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $697 | $1,000 | Not Implemented |
WI0482 # 08 Y:2005 | 08 | 2005 | USE PHOTOCELL CONTROLS | $617 | $2,200 | Not Implemented |
SU0201 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,721 | $0 | Implemented |
SU0201 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,094 | $142 | Not Implemented |
SU0201 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,555 | $617 | Implemented |
SU0201 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $673 | $461 | Implemented |
SU0201 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,182 | $3,211 | Implemented |
SU0201 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,591 | $20,054 | Not Implemented |
OR0475 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,030 | $6,920 | Not Implemented |
OR0475 # 02 Y:2005 | 02 | 2005 | AVOID FROST FORMATION ON EVAPORATORS | $6,600 | $1,500 | Implemented |
OR0475 # 03 Y:2005 | 03 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,300 | $0 | Not Implemented |
OR0475 # 04 Y:2005 | 04 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,700 | $0 | Not Implemented |
OR0475 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $920 | $0 | Not Implemented |
OR0475 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,920 | $0 | Implemented |
MS0266 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $42,481 | $15,060 | Not Implemented |
MS0266 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,381 | $33,730 | Not Implemented |
MS0266 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,987 | $21,549 | Not Implemented |
MS0266 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,524 | $11,556 | Not Implemented |
MS0266 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS | $10,281 | $73 | Not Implemented |
MS0266 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,886 | $4,350 | Not Implemented |
MS0266 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,314 | $322 | Not Implemented |
MS0266 # 08 Y:2005 | 08 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,950 | $1,000 | Not Implemented |