IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0090 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,333 $112 Not Implemented
MI0090 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,291 $6,163 Not Implemented
MI0089 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,096 $600 Not Implemented
MI0089 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $22,325 $2,300 Implemented
MI0089 # 03 Y:2004 03 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $15,302 $270 Not Implemented
MI0089 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,010 $590 Implemented
MI0089 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,036 $50 Implemented
MI0089 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,772 $25,286 Implemented
MI0089 # 07 Y:2004 07 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,783 $4,328 Not Implemented
UF0349 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,789 $10,863 Not Implemented
UF0349 # 02 Y:2004 02 2004 ADD AREA LIGHTING SWITCHES $1,188 $6,111 Not Implemented
UF0349 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $4,583 Not Implemented
UF0349 # 04 Y:2004 04 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,922 $9,158 Not Implemented
MI0088 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,029 $0 Not Implemented
MI0088 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $28,772 $2,300 Implemented
MI0088 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-1,117 $750 Implemented
MI0088 # 04 Y:2004 04 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,760 $40,140 Implemented
MI0088 # 05 Y:2004 05 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $427,935 $0 Implemented
MI0088 # 06 Y:2004 06 2004 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $17,529 $0 Not Implemented
MI0088 # 07 Y:2004 07 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $14,310 $0 Not Implemented
MI0088 # 08 Y:2004 08 2004 PAY BILLS ON TIME TO AVOID LATE FEES $770 $0 Implemented
MI0087 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,721 $590 Not Implemented
MI0087 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,417 $223 Not Implemented
MI0087 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,760 $300 Not Implemented
MI0087 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,320 $14,068 Not Implemented