IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0344 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $473 $21 Implemented
AS0344 # 05 Y:2003 05 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $82 $356 Implemented
AS0344 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68 $167 Implemented
AS0344 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,260 $1,751 n/a
MA0527 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,223 $224,940 Not Implemented
MA0527 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,470 $16,940 n/a
MA0527 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,813 $23,660 Not Implemented
MA0527 # 04 Y:2003 04 2003 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $3,067 $150 Not Implemented
MA0527 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,224 $2,070 Not Implemented
MA0527 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,543 $0 Not Implemented
MA0527 # 07 Y:2003 07 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,300 $0 Not Implemented
MA0527 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $869 $0 Not Implemented
MA0527 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $477 $500 Not Implemented
MA0527 # 10 Y:2003 10 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $137 $0 Not Implemented
OK0655 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $21,416 $543 Not Implemented
OK0655 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $1,300 Not Implemented
OK0655 # 03 Y:2003 03 2003 REPLACE BOILER $45,804 $53,815 n/a
OK0655 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,818 $30,499 Not Implemented
OK0655 # 05 Y:2003 05 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,749 $25,000 Not Implemented
UD0662 # 01 Y:2003 01 2003 IMPROVE SPACE COMFORT CONDITIONING $4,100 $5,938 Implemented
UD0662 # 02 Y:2003 02 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,006 $2,200 Not Implemented
UD0662 # 03 Y:2003 03 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,950 $800 Not Implemented
UD0662 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,823 $1,500 Not Implemented
UD0662 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,817 $0 Not Implemented
UD0662 # 06 Y:2003 06 2003 INSTALL TIMERS AND/OR THERMOSTATS $971 $800 Not Implemented