Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0071 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,330 | $1,200 | Implemented |
LM0071 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,879 | $0 | Implemented |
LM0071 # 06 Y:2004 | 06 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $99,668 | $24,000 | Not Implemented |
LM0071 # 07 Y:2004 | 07 | 2004 | MODIFY CURRENT INCENTIVE PROGRAM | $3,000 | $300 | Implemented |
LM0071 # 08 Y:2004 | 08 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $214,912 | $3,000 | Not Implemented |
LM0071 # 09 Y:2004 | 09 | 2004 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $252,500 | $35,000 | Not Implemented |
LM0071 # 10 Y:2004 | 10 | 2004 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $84,322 | $100,000 | Implemented |
SF0278 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,074 | $0 | n/a |
SF0278 # 02 Y:2004 | 02 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $3,660 | $312 | n/a |
SF0278 # 03 Y:2004 | 03 | 2004 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $65,362 | $60,000 | n/a |
SF0278 # 04 Y:2004 | 04 | 2004 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,624 | $1,887 | n/a |
SF0278 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $290 | $454 | n/a |
SF0278 # 06 Y:2004 | 06 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,847 | $3,074 | n/a |
SF0278 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,285 | $24,474 | n/a |
SF0278 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,293 | $2,800 | n/a |
SF0278 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $1,230 | $3,840 | n/a |
SF0278 # 10 Y:2004 | 10 | 2004 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $13,726 | $60,000 | n/a |
SF0278 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,825 | $34,552 | n/a |
SD0333 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,979 | $15,000 | Not Implemented |
SD0333 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,470 | $600 | Implemented |
SD0333 # 03 Y:2004 | 03 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $7,390 | $0 | Not Implemented |
SD0333 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,253 | $192 | Implemented |
SD0333 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,128 | $0 | Implemented |
SD0333 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,645 | $3,125 | Not Implemented |
SD0333 # 07 Y:2004 | 07 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,600 | $15,000 | Not Implemented |