Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0243 # 04 Y:1988 | 04 | 1988 | INSULATE BARE EQUIPMENT | $249 | $294 | Not Implemented |
OK0243 # 05 Y:1988 | 05 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $133 | $227 | Implemented |
OK0243 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $68 | $0 | Implemented |
OK0244 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $301 | $159 | Implemented |
OK0244 # 02 Y:1988 | 02 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $122 | $255 | Implemented |
OK0244 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $302 | $420 | Implemented |
OK0244 # 04 Y:1988 | 04 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $435 | $0 | Implemented |
OK0244 # 05 Y:1988 | 05 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $1,766 | $1,040 | Implemented |
OK0244 # 06 Y:1988 | 06 | 1988 | INSTALL SET-BACK TIMERS | $415 | $115 | Implemented |
OK0244 # 07 Y:1988 | 07 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $172 | $20 | Not Implemented |
OK0244 # 08 Y:1988 | 08 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $717 | $380 | Not Implemented |
OK0244 # 09 Y:1988 | 09 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $332 | $275 | Implemented |
OK0247 # 01 Y:1988 | 01 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $147 | $400 | Implemented |
OK0247 # 02 Y:1988 | 02 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,492 | $0 | Not Implemented |
OK0247 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $574 | $0 | Implemented |
OK0247 # 04 Y:1988 | 04 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,222 | $645 | Implemented |
OK0247 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $332 | $142 | Implemented |
OK0247 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $212 | $447 | Implemented |
OK0241 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,960 | $6,525 | Not Implemented |
OK0241 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $148 | $71 | Implemented |
OK0241 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $297 | $288 | Implemented |
OK0241 # 04 Y:1987 | 04 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,273 | $1,050 | Implemented |
OK0241 # 05 Y:1987 | 05 | 1987 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $735 | $2,083 | Not Implemented |
OK0241 # 06 Y:1987 | 06 | 1987 | INSTALL TURBULATORS | $108 | $220 | Implemented |
OK0241 # 07 Y:1987 | 07 | 1987 | INCREASE AMOUNT OF CONDENSATE RETURNED | $82 | $220 | Implemented |