IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0076 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,666 $1,516 Implemented
SD0076 # 07 Y:1994 07 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,072 $2,416 Implemented
SD0076 # 08 Y:1994 08 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $231 $175 Implemented
SD0076 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $552 Implemented
SD0076 # 10 Y:1994 10 1994 INSTALL OCCUPANCY SENSORS $1,267 $3,760 Implemented
SD0076 # 11 Y:1994 11 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,149 $630 Implemented
HO0071 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,097 $8,138 Implemented
HO0071 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,235 $7,710 Implemented
HO0071 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,010 $1,953 Implemented
HO0071 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,626 $495 Implemented
CO0297 # 01 Y:1994 01 1994 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $21,300 $16,000 Not Implemented
CO0297 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,150 $34,110 Not Implemented
CO0297 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,820 $3,430 Implemented
CO0297 # 04 Y:1994 04 1994 REUSE RAGS UNTIL COMPLETELY SOILED $4,520 $1,160 Not Implemented
CO0297 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,280 $3,260 Implemented
CO0297 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,200 $5,880 Not Implemented
CO0297 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,120 $920 Not Implemented
CO0297 # 08 Y:1994 08 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $290 $530 Not Implemented
AM0204 # 01 Y:1994 01 1994 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,520 $1,000 Implemented
AM0204 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $1,500 Implemented
AM0204 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $660 $13 Implemented
AM0204 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $185 Implemented
AM0204 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $52 Implemented
AM0204 # 06 Y:1994 06 1994 FILTER AND REUSE HYDRAULIC OIL $1,800 $0 Implemented
AM0204 # 07 Y:1994 07 1994 DISTILL CONTAMINATED SOLVENTS FOR REUSE $95 $6,000 Not Implemented