Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0648 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,340 | $15,608 | Implemented |
SD0648 # 12 Y:2024 | 12 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $982,749 | $783,575 | Not Implemented |
SD0648 # 13 Y:2024 | 13 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $793 | $1,336 | Implemented |
SD0648 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,994 | $4,000 | Implemented |
SD0648 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,906 | $4,828 | Implemented |
SF0612 # 01 Y:2024 | 01 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,332 | $226 | n/a |
SF0612 # 02 Y:2024 | 02 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $175 | $59 | n/a |
SF0612 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $73,026 | $18,461 | n/a |
SF0612 # 04 Y:2024 | 04 | 2024 | ISOLATE HOT OR COLD EQUIPMENT | $3,665 | $4,130 | n/a |
SF0612 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $106 | $151 | n/a |
SF0612 # 06 Y:2024 | 06 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $21,923 | $54,880 | n/a |
SF0612 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,468 | $41,738 | n/a |
SD0647 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,500 | $750 | Not Implemented |
SD0647 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,387 | $5,929 | Not Implemented |
SD0647 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $466,298 | $706,336 | Not Implemented |
SD0647 # 04 Y:2024 | 04 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $344,818 | $0 | Not Implemented |
SD0647 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,235 | $2,159 | Not Implemented |
SD0647 # 06 Y:2024 | 06 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $26,607 | $61,000 | Not Implemented |
SD0647 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,358 | $3,000 | Not Implemented |
SD0647 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,755 | $18,170 | Not Implemented |
SD0647 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,688 | $70,199 | Not Implemented |
SD0647 # 10 Y:2024 | 10 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $14,883 | $5,765 | Not Implemented |
SD0647 # 11 Y:2024 | 11 | 2024 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $42,105 | $0 | Not Implemented |
SD0646 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $678 | $180 | Implemented |
SD0646 # 02 Y:2024 | 02 | 2024 | ADJUST BURNERS FOR EFFICIENT OPERATION | $16,626 | $6,076 | Implemented |