Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0169 # 15 Y:2023 | 15 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $10,836 | $47,613 | Not Implemented |
UD1052 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,427 | $0 | Implemented |
UD1052 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,718 | $6,322 | Not Implemented |
UD1052 # 03 Y:2023 | 03 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,073 | $0 | Implemented |
UD1052 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,488 | $952 | Implemented |
UD1052 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,453 | $9,000 | Not Implemented |
UD1052 # 06 Y:2023 | 06 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,801 | $16,950 | Not Implemented |
UL2217 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,769 | $4,795 | Not Implemented |
UL2217 # 02 Y:2022 | 02 | 2022 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,739 | $7,251 | Not Implemented |
UL2217 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,426 | $0 | Implemented |
UL2217 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,626 | $94,199 | Implemented |
UL2217 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,163 | $19,500 | Implemented |
UL2217 # 06 Y:2022 | 06 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,602 | $50,000 | Implemented |
UL2217 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,919 | $102,018 | Not Implemented |
UL2217 # 08 Y:2022 | 08 | 2022 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $6,524 | $25,900 | Not Implemented |
UL2217 # 09 Y:2022 | 09 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $33,279 | $0 | Implemented |
UL2217 # 10 Y:2022 | 10 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,146 | $30,000 | Implemented |
UD1050 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,383 | $0 | Implemented |
UD1050 # 02 Y:2023 | 02 | 2023 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $3,723 | $0 | Not Implemented |
UD1050 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,863 | $0 | Implemented |
UD1050 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,060 | $0 | Not Implemented |
UD1050 # 05 Y:2023 | 05 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,168 | $0 | Not Implemented |
UD1050 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,940 | $32,403 | Implemented |
UD1049 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,825 | $0 | Implemented |
UD1049 # 02 Y:2023 | 02 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $9,224 | $0 | Not Implemented |