IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0169 # 15 Y:2023 15 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $10,836 $47,613 Not Implemented
UD1052 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,427 $0 Implemented
UD1052 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,718 $6,322 Not Implemented
UD1052 # 03 Y:2023 03 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,073 $0 Implemented
UD1052 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,488 $952 Implemented
UD1052 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $13,453 $9,000 Not Implemented
UD1052 # 06 Y:2023 06 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,801 $16,950 Not Implemented
UL2217 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,769 $4,795 Not Implemented
UL2217 # 02 Y:2022 02 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,739 $7,251 Not Implemented
UL2217 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,426 $0 Implemented
UL2217 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $32,626 $94,199 Implemented
UL2217 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,163 $19,500 Implemented
UL2217 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,602 $50,000 Implemented
UL2217 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,919 $102,018 Not Implemented
UL2217 # 08 Y:2022 08 2022 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,524 $25,900 Not Implemented
UL2217 # 09 Y:2022 09 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,279 $0 Implemented
UL2217 # 10 Y:2022 10 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,146 $30,000 Implemented
UD1050 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,383 $0 Implemented
UD1050 # 02 Y:2023 02 2023 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $3,723 $0 Not Implemented
UD1050 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,863 $0 Implemented
UD1050 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,060 $0 Not Implemented
UD1050 # 05 Y:2023 05 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,168 $0 Not Implemented
UD1050 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,940 $32,403 Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 02 Y:2023 02 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,224 $0 Not Implemented