IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0258 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,751 $37,500 Not Implemented
TT0258 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,652 $4,000 Not Implemented
TT0258 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,092 $10,000 Not Implemented
TT0258 # 06 Y:2021 06 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,703 $7,500 Not Implemented
TT0258 # 07 Y:2021 07 2021 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,108 $5,000 Not Implemented
TT0258 # 08 Y:2021 08 2021 DEVELOP A REPAIR/REPLACE POLICY $445 $0 Not Implemented
TT0256 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,092 $12,000 Not Implemented
TT0256 # 02 Y:2021 02 2021 METER WASTE WATER $10,722 $2,150 Not Implemented
TT0256 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,816 $5,000 Not Implemented
TT0256 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,560 $150 Not Implemented
TT0256 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,866 $29,886 Not Implemented
TT0256 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $825 $3,000 Not Implemented
TT0256 # 07 Y:2021 07 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,460 $250 Not Implemented
TT0256 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $40 Not Implemented
TT0256 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $2,540 $588 Not Implemented
TT0256 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,667 $2,040 Not Implemented
TT0254 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132,788 $431,774 Not Implemented
TT0254 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $42,725 $52,500 Not Implemented
TT0254 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,052 $6,750 Not Implemented
TT0254 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,875 $4,500 Not Implemented
TT0254 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $7,171 $300 Not Implemented
TT0254 # 06 Y:2021 06 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,452 $1,923 Not Implemented
TT0253 # 01 Y:2021 01 2021 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $63,457 $40,000 Implemented
TT0253 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,898 $70,582 Implemented
TT0253 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,036 $3,000 Not Implemented