Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0073 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $151 | $2,312 | Not Implemented |
BS0073 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $506 | $960 | Not Implemented |
BS0073 # 03 Y:2016 | 03 | 2016 | USE OPTIMUM TEMPERATURE | $419 | $116 | Not Implemented |
BS0073 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $108 | $47 | Not Implemented |
BS0073 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,122 | $220 | Not Implemented |
BS0073 # 06 Y:2016 | 06 | 2016 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $582 | $316 | Not Implemented |
BS0073 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,966 | $15,800 | Not Implemented |
BS0068 # 01 Y:2015 | 01 | 2015 | USE OPTIMUM THICKNESS INSULATION | $70 | $51 | Not Implemented |
BS0068 # 02 Y:2015 | 02 | 2015 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,272 | $5,853 | Not Implemented |
BS0068 # 03 Y:2015 | 03 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $1,060 | $4,455 | Not Implemented |
BS0068 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $29 | $100 | Not Implemented |
BS0068 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,480 | $11,240 | Not Implemented |
OR0661 # 01 Y:2015 | 01 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $52,251 | $18,807 | Implemented |
OR0661 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $76,637 | $205,256 | Not Implemented |
OR0661 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $1,989 | $170 | Implemented |
OR0661 # 04 Y:2015 | 04 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,575 | $3,600 | Not Implemented |
OR0661 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,783 | $2,340 | Not Implemented |
OR0660 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $135,000 | $250,000 | Implemented |
OR0660 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $3,310 | $8,500 | Implemented |
OR0660 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,283 | $1,500 | Implemented |
OR0660 # 04 Y:2015 | 04 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,242 | $54,525 | Not Implemented |
OR0659 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,705 | $20,000 | Implemented |
OR0659 # 02 Y:2015 | 02 | 2015 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $26,260 | $7,200 | Implemented |
OR0659 # 03 Y:2015 | 03 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $906 | $900 | Not Implemented |
OR0659 # 04 Y:2015 | 04 | 2015 | INSULATE BARE EQUIPMENT | $6,192 | $8,000 | Implemented |