Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0301 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,087 | $5,000 | Implemented |
MZ0301 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $200 | Implemented |
MZ0301 # 08 Y:2020 | 08 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $304 | $52 | Implemented |
MZ0301 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $673 | $405 | Implemented |
MZ0301 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,307 | $4,100 | Implemented |
MZ0301 # 11 Y:2020 | 11 | 2020 | INSTALL OCCUPANCY SENSORS | $1,132 | $1,720 | Not Implemented |
LS2007 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,423 | $150 | Not Implemented |
LS2007 # 02 Y:2020 | 02 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $67,360 | $13,000 | Not Implemented |
LS2007 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,236 | $1,080 | Not Implemented |
LS2007 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,978 | $559 | Not Implemented |
LS2007 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235,346 | $155,805 | Not Implemented |
LS2007 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $324 | $970 | Not Implemented |
LS2007 # 07 Y:2020 | 07 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $75,962 | $304,000 | Not Implemented |
LS2007 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $8,178 | $56,728 | Not Implemented |
LS2007 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,595 | $34,100 | Not Implemented |
WV0601 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $137 | $530 | Implemented |
WV0601 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $514 | $1,425 | Implemented |
WV0601 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $1,509 | $2,170 | Implemented |
WV0601 # 07 Y:2020 | 07 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,303 | $10,560 | Implemented |
WV0601 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,355 | $1,691 | Implemented |
WV0601 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,885 | $13,900 | Implemented |
WV0601 # 04 Y:2020 | 04 | 2020 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $4,392 | $6,660 | Implemented |
WV0601 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,944 | $3,000 | Implemented |
WV0601 # 02 Y:2020 | 02 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $15,085 | $15,000 | Implemented |
WV0601 # 01 Y:2020 | 01 | 2020 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,050 | $90,000 | Implemented |