IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented
TN0183 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,810 $2,000 Implemented
TN0183 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $1,268 $1,790 Not Implemented
TN0173 # 01 Y:1983 01 1983 INSULATE BARE EQUIPMENT $411 $200 Not Implemented
TN0173 # 02 Y:1983 02 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,800 $1,000 Not Implemented
TN0173 # 03 Y:1983 03 1983 INSTALL SET-BACK TIMERS $1,600 $0 Not Implemented
TN0168 # 01 Y:1983 01 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,775 $0 Not Implemented
TN0168 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,610 $0 Not Implemented
TN0168 # 03 Y:1983 03 1983 REPAIR AND ELIMINATE STEAM LEAKS $7,822 $0 Not Implemented
TN0168 # 04 Y:1983 04 1983 REDUCE SCRAP PRODUCTION $1,763 $2,000 Not Implemented
TN0171 # 01 Y:1983 01 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $13,000 Not Implemented
TN0171 # 02 Y:1983 02 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,000 $0 Not Implemented
TN0171 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,800 $400 Not Implemented
TN0169 # 01 Y:1983 01 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,500 $50,000 Not Implemented
TN0169 # 02 Y:1983 02 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $800 $0 Not Implemented
TN0169 # 03 Y:1983 03 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,500 $0 Not Implemented
TN0164 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $5,000 Not Implemented
TN0164 # 02 Y:1983 02 1983 RECOVER WASTE HEAT FROM EQUIPMENT $1,612 $2,500 Not Implemented
TN0164 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $50 $200 Not Implemented
TN0164 # 04 Y:1983 04 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,500 $1,500 Not Implemented
TN0166 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,800 $21,000 Not Implemented
TN0166 # 02 Y:1983 02 1983 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,600 $25,000 Not Implemented
TN0166 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,450 $10,000 Not Implemented
TN0167 # 01 Y:1983 01 1983 REDUCE VENTILATION AIR $23,801 $11,000 Not Implemented
TN0167 # 02 Y:1983 02 1983 BURN WOOD BY-PRODUCTS FOR HEAT $250,513 $1,000,000 Not Implemented