IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0126 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,467 $0 Not Implemented
LE0126 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,515 $4,320 Implemented
LE0126 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,573 $2,500 Not Implemented
LE0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,916 $0 Not Implemented
LE0126 # 06 Y:2002 06 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,511 $500 Not Implemented
LE0126 # 07 Y:2002 07 2002 IMPROVE LUBRICATION PRACTICES $1,283 $200 Implemented
LE0126 # 08 Y:2002 08 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $653 $0 Not Implemented
LE0127 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,712 $500 Implemented
LE0127 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,304 $0 Not Implemented
LE0127 # 03 Y:2002 03 2002 IMPROVE LUBRICATION PRACTICES $1,271 $200 Not Implemented
LE0127 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $678 $1,000 Not Implemented
LE0127 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,175 $0 Not Implemented
LE0127 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,413 $100 Implemented
LE0127 # 07 Y:2002 07 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $5,791 $6,500 Not Implemented
LE0127 # 08 Y:2002 08 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,725 $2,500 Not Implemented
LE0127 # 09 Y:2002 09 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,681 $3,750 Not Implemented
LE0127 # 10 Y:2002 10 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,572 $0 Implemented
MA0504 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,658 $80,500 Implemented
MA0504 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,765 $284,800 Not Implemented
MA0504 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $24,477 $22,000 Implemented
MA0504 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,725 $46,000 Not Implemented
MA0504 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,155 $13,100 Not Implemented
MA0504 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,901 $7,000 Implemented
MA0504 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Implemented
BD0200 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,728 $1,100 Implemented