IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0197 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $513 $492 Implemented
HO0197 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $2,672 $144 Not Implemented
HO0197 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $5,901 $324 Implemented
HO0197 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $431 $54 Not Implemented
HO0197 # 06 Y:1999 06 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,096 $5,000 Implemented
HO0197 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,217 $720 Implemented
HO0197 # 08 Y:1999 08 1999 INSTALL OCCUPANCY SENSORS $802 $1,600 Implemented
HO0197 # 09 Y:1999 09 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,000 $500 Implemented
HO0197 # 10 Y:1999 10 1999 IMPROVE SPACE COMFORT CONDITIONING $12,000 $6,000 Implemented
HO0197 # 11 Y:1999 11 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,150 $1,000 Not Implemented
NC0159 # 01 Y:1999 01 1999 DISCONNECT BALLASTS $5,744 $100 Implemented
NC0159 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,313 $600 Implemented
NC0159 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,403 $0 Not Implemented
NC0159 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,446 $1,700 Not Implemented
NC0159 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $15,243 $1,500 Not Implemented
NC0159 # 06 Y:1999 06 1999 HEAT WATER WITH EXHAUST HEAT $1,789 $2,000 Implemented
NC0159 # 07 Y:1999 07 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $3,836 $20,000 Not Implemented
NC0159 # 08 Y:1999 08 1999 IMPROVE SPACE COMFORT CONDITIONING $165,125 $55,000 Not Implemented
UL0213 # 01 Y:1999 01 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,043 $875 Not Implemented
UL0213 # 02 Y:1999 02 1999 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $21,700 $25,000 Implemented
UL0213 # 03 Y:1999 03 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $93,500 $12,000 Implemented
WI0341 # 01 Y:1999 01 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $40,755 $0 Not Implemented
WI0341 # 02 Y:1999 02 1999 RECYCLE CLEANING SOLVENT AND REUSE $4,636 $7,000 Not Implemented
WI0341 # 03 Y:1999 03 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,404 $8,000 Implemented
WI0341 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $648 $1,086 Implemented